top of page
Our Projects
Raleigh Durham Airport Landside Civil
Location: Raleigh, NC.
General Contractor: DPR.
Renovations for the electrical work of the airport signs and runway lighting.
General Contractor: DPR.
Renovations for the electrical work of the airport signs and runway lighting.
Raleigh Durham Airport Bridgeworks
Location: Raleigh, NC
General Contractor:
Electrical renovations to the terminal bridges.
General Contractor:
Electrical renovations to the terminal bridges.
Microsoft BN7 x-Archive: data center
Location: Boydton, VA
Special turn-key
Power/cooling/condensation pumps and discharge for tape storage devices within the data center environment. Work was designed and installed ahead of blackout dates to meet the owners’ expedited needs.
Special turn-key
Power/cooling/condensation pumps and discharge for tape storage devices within the data center environment. Work was designed and installed ahead of blackout dates to meet the owners’ expedited needs.
QTS DH211
Location: Richmond, VA
General Contractor: Hitt Contracting
Data center fit out installation of nine 2.5MW generators, nine 1500kva UPS’, 36 STS’ and PDU’s, MV Switchgear, MV cabling and duct banks, cable bus and large feeders.
General Contractor: Hitt Contracting
Data center fit out installation of nine 2.5MW generators, nine 1500kva UPS’, 36 STS’ and PDU’s, MV Switchgear, MV cabling and duct banks, cable bus and large feeders.
Microsoft BN14
Location: Boydton, VA
Installing electrical gear for load banking. 1600amp buss duct, 1600amp breaker panel, cam-locks, tap boxes, Buss duct support poles. Capabilities for Ops to pull the load bank to the fence to connect the load bank to the GENs without pulling 100’+ of cables.
Installing electrical gear for load banking. 1600amp buss duct, 1600amp breaker panel, cam-locks, tap boxes, Buss duct support poles. Capabilities for Ops to pull the load bank to the fence to connect the load bank to the GENs without pulling 100’+ of cables.
IES BN1 Data Center
Location: Boydton, VA
Design build project providing Communication secure raceways in GRC conduits and lockable pillboxes in BN1 where above ceiling space is a premium. Further enhanced this project with custom fabricated secure wireway with internal couplings and lockable covers to condense change over from six 4” GRC conduit racks in the congested areas.
Design build project providing Communication secure raceways in GRC conduits and lockable pillboxes in BN1 where above ceiling space is a premium. Further enhanced this project with custom fabricated secure wireway with internal couplings and lockable covers to condense change over from six 4” GRC conduit racks in the congested areas.
IAD 169 and 179
Location: Ashburn, VA
General Contractor: Hitt Contracting
Construction of two 500,000 square foot data center shells.
General Contractor: Hitt Contracting
Construction of two 500,000 square foot data center shells.
Fort Meade ECPS2
Location: Ft. Meade, md
General Contractor: Hensel Phelps
1,107,357 sqft parking garage also serving as the campus’ area of refuge building.
General Contractor: Hensel Phelps
1,107,357 sqft parking garage also serving as the campus’ area of refuge building.
Asheville Airport WP#1
Location: Asheville, NC
General Contractor: Hensel Phelps
The first phase of the Asheville Airport renovation project which included construction of the new airfield lighting control vault, underground electrical duct banks, a new generator, upgrades to the fire alarm system and a new Airfield Lighting Control & Monitoring System.
General Contractor: Hensel Phelps
The first phase of the Asheville Airport renovation project which included construction of the new airfield lighting control vault, underground electrical duct banks, a new generator, upgrades to the fire alarm system and a new Airfield Lighting Control & Monitoring System.
Bcause BitCoin
Location: Virginia Beach, VA
16MW of utility power which included building the MV metering and pad mount switches to deliver power to the pad mount 2.5MW transformers. Energized and commissioned power to over 10,000 Bitcoin Miners in less than 3 months. Interior work included switchboards to dry-type transformers mounted above custom fabricated structural steel with respective panelboards underneath. This was a turn-key project self-performed 100% by Alpha Craft Technologies along with our design-build engineering partner.
16MW of utility power which included building the MV metering and pad mount switches to deliver power to the pad mount 2.5MW transformers. Energized and commissioned power to over 10,000 Bitcoin Miners in less than 3 months. Interior work included switchboards to dry-type transformers mounted above custom fabricated structural steel with respective panelboards underneath. This was a turn-key project self-performed 100% by Alpha Craft Technologies along with our design-build engineering partner.
bottom of page